STD Logo

Predictive AI
That Outperforms

Adds Alpha, Reduces Beta, Controls Risk

(WBS) Technical Data

Longer Term Trading Plans for WBS
  • Buy WBS near 54.56 target 61.5 stop loss @ 54.4 Details
  • The technical summary data tells us to buy WBS near 54.56 with an upside target of 61.5. This data also tells us to set a stop loss @ 54.4 to protect against excessive loss in case the stock begins to move against the trade. 54.56 is the first level of support below 58.88 , and by rule, any test of support is a buy signal. In this case, support 54.56 is being tested, a buy signal would exist.

  • Short WBS slightly under 61.5, target 54.56, stop loss @ 61.68 Details
  • The technical summary data is suggesting a short of WBS as it gets near 61.5 with a downside target of 54.56. We should have a stop loss in place at 61.68though. 61.5 is the first level of resistance above 58.88, and by rule, any test of resistance is a short signal. In this case, if resistance 61.5 is being tested, a short signal would exist.

Swing Trading Plans for WBS
  • Buy WBS slightly over 59.7, target 61.5, Stop Loss @ 59.53 Details
  • If 59.7 begins to break higher, the technical summary data tells us to buy WBS just slightly over 59.7, with an upside target of 61.5. The data also tells us to set a stop loss @ 59.53 in case the stock turns against the trade. 59.7 is the first level of resistance above 58.88, and by rule, any break above resistance is a buy signal. In this case, 59.7, initial resistance, would be breaking higher, so a buy signal would exist. Because this plan is based on a break of resistance, it is referred to as a Long Resistance Plan.

  • Short WBS slightly near 59.7, target 54.56, Stop Loss @ 59.87. Details
  • The technical summary data is suggesting a short of WBS if it tests 59.7 with a downside target of 54.56. We should have a stop loss in place at 59.87 though in case the stock begins to move against the trade. By rule, any test of resistance is a short signal. In this case, if resistance, 59.7, is being tested a short signal would exist. Because this plan is a short plan based on a test of resistance it is referred to as a Short Resistance Plan.

Day Trading Plans for WBS
  • Buy WBS slightly over 59.02, target 59.7, Stop Loss @ 58.88 Details
  • If 59.02 begins to break higher, the technical summary data tells us to buy WBS just slightly over 59.02, with an upside target of 59.7. The data also tells us to set a stop loss @ 58.88 in case the stock turns against the trade. 59.02 is the first level of resistance above 58.88, and by rule, any break above resistance is a buy signal. In this case, 59.02, initial resistance, would be breaking higher, so a buy signal would exist. Because this plan is based on a break of resistance, it is referred to as a Long Resistance Plan.

  • Short WBS slightly near 59.02, target 54.56, Stop Loss @ 59.16. Details
  • The technical summary data is suggesting a short of WBS if it tests 59.02 with a downside target of 54.56. We should have a stop loss in place at 59.16 though in case the stock begins to move against the trade. By rule, any test of resistance is a short signal. In this case, if resistance, 59.02, is being tested a short signal would exist. Because this plan is a short plan based on a test of resistance it is referred to as a Short Resistance Plan.

Check the time stamp on this data. Updated AI-Generated Signals for Webster Financial Corporation (WBS) available here: WBS.

WBS Ratings for July 13:

Term →Near Mid Long
Rating Strong Strong Neutral
P1 0 0 47.2
P2 59.02 59.7 54.56
P3 60.1 61.49 61.5
Triggers may have already come
Get Real Time Triggers Here
AI Generated Signals for WBS

WBS Long Term Analysis for July 13 2025

Blue = Current Price
Red= Resistance
Green = Support

Real Time Updates for Repeat Institutional Readers:
Instructions:
  • Click the Get Real Time Updates button below.

  • In the login prompt, select forgot username

  • Type the email you use for Factset

  • Use the user/pass you receive to login

  • You will have 24/7 access to real time updates.

From then on you can just click to get the real time update whenever you want.

GET REAL TIME UPDATES

Our Market Crash Leading Indicator isEvitar Corte.
  • Evitar Corte warned of market crash risk four times since 2000.

  • It identified the Internet Debacle before it happened.

  • It identified the Credit Crisis before it happened.

  • It identified the Corona Crash too.

  • See what Evitar Corte is Saying Now.

Get Notified When our Ratings Change:Take a Trial

This report was produced using AI developed by Stock Traders Daily.  Over the past 20 years this proprietary AI has been refined to help identify the most opportune trading strategies for both individual stocks and the stock markets themselves.  This methodology is also applied to Index options, ETFs, and futures.  The objective of this specific report is to optimize trading in Webster Financial Corporation (NYSE: WBS) while incorporating prudent risk controls.

Warning:

This is a static report, the data below was valid at the time of the publication, but support and resistance levels for WBS change over time, so the report should be updated regularly.  Real Time updates are provided to subscribers.  Unlimited Real Time Reports.

Subscribers also receive market analysis, stock correlation tools, macroeconomic observations, timing tools, and protection from market crashes using Evitar Corte.  

Instructions:

The rules that govern the data in this report are the rules of Technical Analysis.  For example, if WBS is testing support buy signals surface, and resistance is the target.  Conversely, if resistance is being tested, that is a sign to control risk or short, and support would be the downside target accordingly.  In each case, the trigger point is designed to be both an ideal place to enter a position (avoid trading in the middle of a trading channel), and it acts as a level of risk control too.

Swing Trades, Day Trades, and Longer term Trading Plans:

This data is refined to differentiate trading plans for Day Trading, Swing Trading, and Long Term Investing plans for WBS too.  All of these are offered below the Summary Table.