tradethepoolpool ads

When the Price of Webster Financial $WBS Talks, People Listen

Longer Term Trading Plans for WBS
  • Buy WBS slightly over 46.94 target 53.10 stop loss @ 46.8 Details
  • The technical summary data tells us to buy WBS near 46.94 with an upside target of 53.10. This data also tells us to set a stop loss @ 46.8 to protect against excessive loss in case the stock begins to move against the trade. 46.94 is the first level of support below 51.93 , and by rule, any test of support is a buy signal. In this case, support 46.94 is being tested, a buy signal would exist.

  • Short WBS slightly under 53.10, target 46.94, stop loss @ 53.25 Details
  • The technical summary data is suggesting a short of WBS as it gets near 53.10 with a downside target of 46.94. We should have a stop loss in place at 53.25though. 53.10 is the first level of resistance above 51.93, and by rule, any test of resistance is a short signal. In this case, if resistance 53.10 is being tested, a short signal would exist.

Swing Trading Plans for WBS
  • Buy WBS slightly over 52.89, target 53.10, Stop Loss @ 52.74 Details
  • If 52.89 begins to break higher, the technical summary data tells us to buy WBS just slightly over 52.89, with an upside target of 53.10. The data also tells us to set a stop loss @ 52.74 in case the stock turns against the trade. 52.89 is the first level of resistance above 51.93, and by rule, any break above resistance is a buy signal. In this case, 52.89, initial resistance, would be breaking higher, so a buy signal would exist. Because this plan is based on a break of resistance, it is referred to as a Long Resistance Plan.

  • Short WBS slightly near 52.89, target 51.49, Stop Loss @ 53.04. Details
  • The technical summary data is suggesting a short of WBS if it tests 52.89 with a downside target of 51.49. We should have a stop loss in place at 53.04 though in case the stock begins to move against the trade. By rule, any test of resistance is a short signal. In this case, if resistance, 52.89, is being tested a short signal would exist. Because this plan is a short plan based on a test of resistance it is referred to as a Short Resistance Plan.

Day Trading Plans for WBS
  • Buy WBS slightly over 52.58, target 52.89, Stop Loss @ 52.46 Details
  • If 52.58 begins to break higher, the technical summary data tells us to buy WBS just slightly over 52.58, with an upside target of 52.89. The data also tells us to set a stop loss @ 52.46 in case the stock turns against the trade. 52.58 is the first level of resistance above 51.93, and by rule, any break above resistance is a buy signal. In this case, 52.58, initial resistance, would be breaking higher, so a buy signal would exist. Because this plan is based on a break of resistance, it is referred to as a Long Resistance Plan.

  • Short WBS slightly near 52.58, target 51.50, Stop Loss @ 52.7. Details
  • The technical summary data is suggesting a short of WBS if it tests 52.58 with a downside target of 51.50. We should have a stop loss in place at 52.7 though in case the stock begins to move against the trade. By rule, any test of resistance is a short signal. In this case, if resistance, 52.58, is being tested a short signal would exist. Because this plan is a short plan based on a test of resistance it is referred to as a Short Resistance Plan.

Check the time stamp on this data. Updated AI-Generated Signals for Webster Financial (WBS) available here: WBS.

WBS Ratings for March 03:

Term →Near Mid Long
Rating Weak Strong Weak
P1 0 0 40.97
P2 51.50 51.49 46.94
P3 52.58 52.89 53.10
Triggers may have already come
Get Real Time Triggers Here
AI Generated Signals for WBS

WBS Long Term Analysis for March 3 2023

Blue = Current Price
Red= Resistance
Green = Support

Real Time Updates for Repeat Institutional Readers:
Instructions:
  • Click the Get Real Time Updates button below.

  • In the login prompt, select forgot username

  • Type the email you use for Factset

  • Use the user/pass you receive to login

  • You will have 24/7 access to real time updates.

From then on you can just click to get the real time update whenever you want.

GET REAL TIME UPDATES

Our Market Crash Leading Indicator isEvitar Corte.
  • Evitar Corte warned of market crash risk four times since 2000.

  • It identified the Internet Debacle before it happened.

  • It identified the Credit Crisis before it happened.

  • It identified the Corona Crash too.

  • See what Evitar Corte is Saying Now.

Get Notified When our Ratings Change:Take a Trial

This is not EF Hutton, but it could be more #powerful.  A picture speaks a thousand words, they say, and the #priceaction of Webster Financial (NYSE: WBS) tells an important story.  The movement tells us where investors perceive value, or the lack of it, and if we pay attention we can capture opportunity.  The data below for WBS can be used as an example, and demonstrate how to do this for other stocks too.  This data was current at the time of publication, but it is not updated in real time here. If you want real time updates, or data on a different stock, please get one here Unlimited Real Time Reports