tradethepoolpool ads

Webster Financial $WBS Investment Analysis

Longer Term Trading Plans for WBS
  • Buy WBS slightly over 40.97 target 46.94 stop loss @ 40.85 Details
  • The technical summary data tells us to buy WBS near 40.97 with an upside target of 46.94. This data also tells us to set a stop loss @ 40.85 to protect against excessive loss in case the stock begins to move against the trade. 40.97 is the first level of support below 43.03 , and by rule, any test of support is a buy signal. In this case, support 40.97 would be being tested, so a buy signal would exist.

  • Short WBS slightly under 46.94, target 40.97, stop loss @ 47.08 Details
  • The technical summary data is suggesting a short of WBS as it gets near 46.94 with a downside target of 40.97. We should have a stop loss in place at 47.08though. 46.94 is the first level of resistance above 43.03, and by rule, any test of resistance is a short signal. In this case, if resistance 46.94 is being tested, so a short signal would exist.

Swing Trading Plans for WBS
  • Buy WBS slightly over 43.90, target 46.94, Stop Loss @ 43.77 Details
  • If 43.90 begins to break higher, the technical summary data tells us to buy WBS just slightly over 43.90, with an upside target of 46.94. The data also tells us to set a stop loss @ 43.77 in case the stock turns against the trade. 43.90 is the first level of resistance above 43.03, and by rule, any break above resistance is a buy signal. In this case, 43.90, initial resistance, would be breaking higher, so a buy signal would exist. Because this plan is based on a break of resistance, it is referred to as a Long Resistance Plan.

  • Short WBS slightly near 43.90, target 40.97, Stop Loss @ 44.03. Details
  • The technical summary data is suggesting a short of WBS if it tests 43.90 with a downside target of 40.97. We should have a stop loss in place at 44.03 though in case the stock begins to move against the trade. By rule, any test of resistance is a short signal. In this case, if resistance, 43.90, is being tested a short signal would exist. Because this plan is a short plan based on a test of resistance it is referred to as a Short Resistance Plan.

Day Trading Plans for WBS
  • Buy WBS slightly over 43.90, target 46.94, Stop Loss @ 43.8 Details
  • If 43.90 begins to break higher, the technical summary data tells us to buy WBS just slightly over 43.90, with an upside target of 46.94. The data also tells us to set a stop loss @ 43.8 in case the stock turns against the trade. 43.90 is the first level of resistance above 43.03, and by rule, any break above resistance is a buy signal. In this case, 43.90, initial resistance, would be breaking higher, so a buy signal would exist. Because this plan is based on a break of resistance, it is referred to as a Long Resistance Plan.

  • Short WBS slightly near 43.90, target 41.23, Stop Loss @ 44. Details
  • The technical summary data is suggesting a short of WBS if it tests 43.90 with a downside target of 41.23. We should have a stop loss in place at 44 though in case the stock begins to move against the trade. By rule, any test of resistance is a short signal. In this case, if resistance, 43.90, is being tested a short signal would exist. Because this plan is a short plan based on a test of resistance it is referred to as a Short Resistance Plan.

Check the time stamp on this data. Updated AI-Generated Signals for Webster Financial (WBS) available here: WBS.

WBS Ratings for March 13:

Term →Near Mid Long
Rating Weak Strong Weak
P1 0 0 40.97
P2 41.23 43.90 46.94
P3 43.77 48.20 53.10
Triggers may have already come
Get Real Time Triggers Here
AI Generated Signals for WBS

WBS Long Term Analysis for March 13 2023

Blue = Current Price
Red= Resistance
Green = Support

Real Time Updates for Repeat Institutional Readers:
Instructions:
  • Click the Get Real Time Updates button below.

  • In the login prompt, select forgot username

  • Type the email you use for Factset

  • Use the user/pass you receive to login

  • You will have 24/7 access to real time updates.

From then on you can just click to get the real time update whenever you want.

GET REAL TIME UPDATES

Our Market Crash Leading Indicator isEvitar Corte.
  • Evitar Corte warned of market crash risk four times since 2000.

  • It identified the Internet Debacle before it happened.

  • It identified the Credit Crisis before it happened.

  • It identified the Corona Crash too.

  • See what Evitar Corte is Saying Now.

Get Notified When our Ratings Change:Take a Trial

With an objective approach to Webster Financial (NYSE: WBS), Stock Traders Daily attempts to go with the flow of the market by utilizing a combination of market analysis and stock analysis.

Warning:

This is a static report, the data below was valid at the time of the publication, but support and resistance levels for WBS change over time, so the report should be updated regularly.  Real Time updates are provided to subscribers.  Unlimited Real Time Reports.

Subscribers also receive market analysis, stock correlation tools, macroeconomic observations, timing tools, and protection from market crashes using Evitar Corte.  

Instructions:

The rules that govern the data in this report are the rules of Technical Analysis.  For example, if WBS is testing support buy signals surface, and resistance is the target.  Conversely, if resistance is being tested, that is a sign to control risk or short, and support would be the downside target accordingly.  In each case, the trigger point is designed to be both an ideal place to enter a position (avoid trading in the middle of a trading channel), and it acts as a level of risk control too.

Swing Trades, Day Trades, and Longer term Trading Plans:

This data is refined to differentiate trading plans for Day Trading, Swing Trading, and Long Term Investing plans for WBS too.  All of these are offered below the Summary Table.