STD Logo

Predictive AI
That Outperforms

Adds Alpha, Reduces Beta, Controls Risk

(EVM) Investment Analysis and Advice

Longer Term Trading Plans for EVM
  • Buy EVM slightly over 8.96 target 9.44 stop loss @ 8.93 Details
  • The technical summary data tells us to buy EVM near 8.96 with an upside target of 9.44. This data also tells us to set a stop loss @ 8.93 to protect against excessive loss in case the stock begins to move against the trade. 8.96 is the first level of support below 9.41 , and by rule, any test of support is a buy signal. In this case, support 8.96 is being tested, a buy signal would exist.

  • Short EVM slightly under 9.44, target 8.96, stop loss @ 9.47 Details
  • The technical summary data is suggesting a short of EVM as it gets near 9.44 with a downside target of 8.96. We should have a stop loss in place at 9.47though. 9.44 is the first level of resistance above 9.41, and by rule, any test of resistance is a short signal. In this case, if resistance 9.44 is being tested, a short signal would exist.

Swing Trading Plans for EVM
  • Buy EVM slightly over n/a, target n/a, Stop Loss @ 0 Details
  • If n/a begins to break higher, the technical summary data tells us to buy EVM just slightly over n/a, with an upside target of n/a. The data also tells us to set a stop loss @ 0 in case the stock turns against the trade. n/a is the first level of resistance above 9.41, and by rule, any break above resistance is a buy signal. In this case, n/a, initial resistance, would be breaking higher, so a buy signal would exist. Because this plan is based on a break of resistance, it is referred to as a Long Resistance Plan.

  • Short EVM slightly near n/a, target 8.96, Stop Loss @ 0. Details
  • The technical summary data is suggesting a short of EVM if it tests n/a with a downside target of 8.96. We should have a stop loss in place at 0 though in case the stock begins to move against the trade. By rule, any test of resistance is a short signal. In this case, if resistance, n/a, is being tested a short signal would exist. Because this plan is a short plan based on a test of resistance it is referred to as a Short Resistance Plan.

Day Trading Plans for EVM
  • Buy EVM slightly over 9.44, target n/a, Stop Loss @ 9.42 Details
  • If 9.44 begins to break higher, the technical summary data tells us to buy EVM just slightly over 9.44, with an upside target of n/a. The data also tells us to set a stop loss @ 9.42 in case the stock turns against the trade. 9.44 is the first level of resistance above 9.41, and by rule, any break above resistance is a buy signal. In this case, 9.44, initial resistance, would be breaking higher, so a buy signal would exist. Because this plan is based on a break of resistance, it is referred to as a Long Resistance Plan.

  • Short EVM slightly near 9.44, target 8.96, Stop Loss @ 9.46. Details
  • The technical summary data is suggesting a short of EVM if it tests 9.44 with a downside target of 8.96. We should have a stop loss in place at 9.46 though in case the stock begins to move against the trade. By rule, any test of resistance is a short signal. In this case, if resistance, 9.44, is being tested a short signal would exist. Because this plan is a short plan based on a test of resistance it is referred to as a Short Resistance Plan.

Check the time stamp on this data. Updated AI-Generated Signals for Eaton Vance California Municipal Bond Fund Of Beneficial Interest $.01 Par Value (EVM) available here: EVM.

EVM Ratings for March 12:

Term →Near Mid Long
Rating Strong Neutral Neutral
P1 0 0 8.45
P2 9.42 9.37 8.96
P3 0 9.44
Triggers may have already come
Get Real Time Triggers Here
AI Generated Signals for EVM

EVM Long Term Analysis for March 12 2024

Blue = Current Price
Red= Resistance
Green = Support

Real Time Updates for Repeat Institutional Readers:
Instructions:
  • Click the Get Real Time Updates button below.

  • In the login prompt, select forgot username

  • Type the email you use for Factset

  • Use the user/pass you receive to login

  • You will have 24/7 access to real time updates.

From then on you can just click to get the real time update whenever you want.

GET REAL TIME UPDATES

Our Market Crash Leading Indicator isEvitar Corte.
  • Evitar Corte warned of market crash risk four times since 2000.

  • It identified the Internet Debacle before it happened.

  • It identified the Credit Crisis before it happened.

  • It identified the Corona Crash too.

  • See what Evitar Corte is Saying Now.

Get Notified When our Ratings Change:Take a Trial

Prudent Investment Analysis requires observations of the support and resistance levels for Eaton Vance California Municipal Bond Fund Of Beneficial Interest $.01 Par Value (NYSE: EVM) too.  These define prudent trading plans.

Warning:

This is a static report, the data below was valid at the time of the publication, but support and resistance levels for EVM change over time, so the report should be updated regularly.  Real Time updates are provided to subscribers.  Unlimited Real Time Reports.

Subscribers also receive market analysis, stock correlation tools, macroeconomic observations, timing tools, and protection from market crashes using Evitar Corte.  

Instructions:

The rules that govern the data in this report are the rules of Technical Analysis.  For example, if EVM is testing support buy signals surface, and resistance is the target.  Conversely, if resistance is being tested, that is a sign to control risk or short, and support would be the downside target accordingly.  In each case, the trigger point is designed to be both an ideal place to enter a position (avoid trading in the middle of a trading channel), and it acts as a level of risk control too.

Swing Trades, Day Trades, and Longer term Trading Plans:

This data is refined to differentiate trading plans for Day Trading, Swing Trading, and Long Term Investing plans for EVM too.  All of these are offered below the Summary Table.